Marr, near Doncaster, South Yorkshire
Site Status: Planning permission has been granted by the Council and work has begun to prepare the site for construction
Local Authority: Doncaster Metropolitan Borough Council


The site we have identified lies on arable farm land to the south of Marr.

The wind farm will comprise of four wind turbines, each with an electricity generating capacity of between 2-3 MW. The turbines will have a hub height of around 80m, a rotor diameter of around 90m and a maximum tip height of 125m.

It will provide enough electricity for up to 6,700 homes with no production of greenhouse gases.

Click here for a plan showing the design of the wind farm

Site investigations will shortly start on the site. This will provide information for the design of the foundations for the turbines.

The local electricity grid operator,YEDL, has also provided us with the information required to connect the wind farm to the grid.

Pre Qualification Questionnaires have been completed by a number of prospective civil engineering and electrical contractors.

Click here to download a Non Technical Summary of the planning application

For further information please contact Rob Williams, Project Manager, or Bob Swainson, Community Liaison Manager on 01740 658500 or marr@banksdevelopments.com

Scroll up
Scroll down
 
 
Registered office: West Cornforth, Ferryhill, County Durham DL17 9EU.
Registered in England number 2267400. VAT registration number 569 3236 14.

©The Banks Group. All rights reserved. For more details see our Terms and Conditions.
Designed by Guerilla Interactive